River Edge Park

Clients

Confidential

Region

IL

City

Aurora

Budget

Confidential

Year Completed

2023

Size

160000 sq ft

Sector

Private

Sub-Sector

Community Recreation Park

steel detailing services, River Edge Park project, structural steel detailing, 3D steel modelling, fabrication-ready steel drawings, steel erection drawings, industrial steel project, Nexont Engineering steel projects, structural steel detailing company, commercial building steel structure
steel detailing services, River Edge Park project, structural steel detailing, 3D steel modelling, fabrication-ready steel drawings, steel erection drawings, industrial steel project, Nexont Engineering steel projects, structural steel detailing company, commercial building steel structure
steel detailing services, River Edge Park project, structural steel detailing, 3D steel modelling, fabrication-ready steel drawings, steel erection drawings, industrial steel project, Nexont Engineering steel projects, structural steel detailing company, commercial building steel structure
steel detailing services, River Edge Park project, structural steel detailing, 3D steel modelling, fabrication-ready steel drawings, steel erection drawings, industrial steel project, Nexont Engineering steel projects, structural steel detailing company, commercial building steel structure
steel detailing services, River Edge Park project, structural steel detailing, 3D steel modelling, fabrication-ready steel drawings, steel erection drawings, industrial steel project, Nexont Engineering steel projects, structural steel detailing company, commercial building steel structure
steel detailing services, River Edge Park project, structural steel detailing, 3D steel modelling, fabrication-ready steel drawings, steel erection drawings, industrial steel project, Nexont Engineering steel projects, structural steel detailing company, commercial building steel structure
Our Client’s Challenge
The River Edge Park renovation was a highly complex detailing project. Since it involved an existing structure, every new element had to be carefully coordinated with the original design. The unique geometry, curved profiles, and sloped features added significant modeling challenges. On top of that, the client required delivery within a very tight schedule, with numerous moment connections that demanded precise engineering and detailing. Achieving accuracy while meeting the fast-paced timeline was the biggest hurdle.
Our Approach And Solution
Nexont Engineering leveraged SDS2 software to build a precise 3D model of the park structure. Our detailing team carefully coordinated with the existing framework to avoid clashes and ensure smooth integration of new elements. Special attention was given to the design and detailing of multiple moment connections, aligning every detail with the client’s exact requirements. By streamlining internal review processes and running strict quality checks, we were able to deliver error-free drawings and connection designs within the client’s aggressive timeline. Continuous communication with the project team ensured timely adjustments and kept the project moving without delays.
What Customers Say?
"Nexont Engineering exceeded our expectations on the River Edge Park renovation. The project’s complexity and demanding schedule required a partner who could deliver both speed and precision—and Nexont did exactly that. Their expertise in SDS2 modeling, connection design, and seamless coordination helped us complete this project with confidence. We truly value their commitment and accuracy."